Static Gradient Survey (SGS)

Used to measure the closed-in bottom-hole pressure of a reservoir to determine its stabilized pressure and the static gradient of the well fluids. The pressure survey is only carried out when the well has been closed in for a period of time for the reservoir pressures to stabilize.

Operations

  • Candidate well to be closed-in minimum 24 hrs prior well entry for well pressure to stabilize.
  • Rig-up Wireline PCE/ Equipment
  • Take current well parameters.
  • Pressure test wireline PCE.
  • Conduct sinker bar run to simulate the actual run based on the programs.
  • Run In Hole PPS Gauges to desired depth and stop as per-programmed.
  • Retrieve Data.
  • Rig-Down PCE.

Advertisements


Categories: Oil & Gas Notes

Tags: ,

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: